Tango Roof Tile Conveyor Cost Savings

Belting is the ideal solution for fast installation and minimized maintenance on belt-driven conveyors.

Tango on Roof Tile Conveyor


Case Study: Global Brick and Clay Roof Tile Manufacturer
Application: Belt-driven Roof Tile Conveyors

Annual Cost Savings: $10,878

  • 95% reduced labor costs
  • 75% reduced operating costs
  • 2.25x faster belt installation time
  • Virtually eliminated lost production
Problem:   Calculated Cost Savings
  1. Polyurethane belts stretched and needed to be re-tensioned at least
    3 times each year.
  2. Production came to a stop for 90+ minutes each time the belts needed
    to be re-tensioned.
  3. Proper installation of each new belt took 45 minutes to complete.
  Case Study Chart
Solution: Tango Belting
  1. Tango eliminates the need for re-tensioning by maintaining the
    installed tension.
  2. Tango is a maintenance-free solution, keeping production lines
    up and running.
  3. Tango Belts are installed in 20 minutes or less.

<Back to List
Learn more about Tango Conveyor Belting
Learn more about other Tile Manufacturing solutions from Fenner Drives

Find out how you can save with Tango.
Complete the form below or click to find your local Fenner Drives rep

Back To Top