SuperGrip Top is the ideal solution for longer belt life and reduced downtime on belt-driven conveyors.
|
Case Study: Global Plastic Cup Manufacturer
Application: Belt-driven Cup Bagging Conveyors
Annual Cost Savings: $122,386
- 98% reduced labor costs
- 98% reduced downtime
- 85% reduced operating costs
- 20x longer belt life
- 3x faster installation time
|
Problem: |
|
Calculated Cost Savings |
- Urethane extruded belts failed every two weeks due to welds breaking on the
small conveyor pulleys.
- Production had to be stopped for 30 minutes for every belt change due to
required welding.
|
|
 |
Solution: PowerTwist Move SuperGrip Top Belting |
|
- PT Move SuperGrip Top lasts 10 months in the same application.
- PT Move link belting is made to length by hand with no welding and no curing time involved – installation time was reduced to 10 minutes, thus greatly reducing production downtime.
|
|
<Back to List
Learn more about PowerTwist Move specialty conveyor belting
Learn more about other Packaging solutions from Fenner Drives
Find out how you can save with PowerTwist Move.
Complete the form below or click to find your local Fenner Drives rep